Rebuild to large 3 bed detached bungalow in North Abingdon, duration 16 weeks.

Extension upwards and outwards to provide 4 bedrooms upstairs and change in layout downstairs. One constraint of the project was to extend but remain within the permitted volume increase permitted by greenbelt planning restrictions. The property was reduced to 3 external walls and rebuilt. The roof was designed to provide maximum usable space and minimise areas lost in eves. The project included new insulated floors, complete rewire, new gas central heating system, underfloor heating, kitchen, bathrooms, external works and prefab garage removed and rebuilt.