Refurbishment of Ground floor flat in central Abingdon. Duration 12 weeks. The property was in a poor condition and needed complete refurbishment. It was redesigned and walls removed to suit new open plan layout. The work included new insulated floors, complete rewire, new electric boiler and heating system, new oak flooring, new kitchen and bathroom fitted, and decoration.