Case Studies
Central heating installation – Marlow July 2018
Building Refurbishment - Marlow
The client says:
The works were completed on time, on budget and with excellence. The team was very friendly with a positive and enthusiastic attitude with a desire to do well. It was a pleasure to work with TVM (Oxford) Limited.
A.B. – Thames Valley Police
Refurbishment – Didcot Oxfordshire 2018 - 2019
Refurbishment – Abingdon Oxfordshire 2019
Refurbishment – Didcot Oxfordshire 2018 - 2019
The client says:
“If ever we any jobs that need to be done we always ask TVM because the quality of work is excellent and they are so easy and friendly to communicate with, and always doing their best to accommodate all or needs.”
Abivale Veterinary Group, Abingdon.
Refurbishement – Iver
Bathroom Refurbishment – Botley October 2018
Unvented cylinder and electric boiler installation – Abingdon December 2017
The Client says:
“I have always found TVM very easy to deal with and has kept me well informed throughout the work. The original quotation was competitive and the finished result was of a very high quality. I have no hesitation in recommending TVM.”
JM. Abingdon
Boiler & Cylinder Installation – Abingdon August 2019
The Client says:
“I have always found TVM very easy to deal with and has kept me well informed throughout the work. The original quotation was competitive and the finished result was of a very high quality. I have no hesitation in recommending TVM.
JM. Abingdon
Roof Refurbishment – Kidlington March 2019
The work comprised of the erection of scaffolding, investigation of roof leaks and the refurbishment of the roof of a police headquarters building
The client said:
The team worked extremely hard, completed on time. Everyone was very helpful with a great desire to do well.
A.B. – Thames Valley Police